In a detailed discussion with you we would like to talk about the reason of the redevelopment of your object.
Certainly a cost use calculation is to be accomplished, in order to secure the investment lastingly.
In many cases favourable promotion credits are possible, starting from 1,85%per annum.
A goal is here among other things also the saving of CO 2.
The smaller the operating cost, the more highly the cold rent...
In many cases with old buildings we use thermal image camera for examining and so we are able to locate fast weak points.
Also the determination of the current heat requirement is important for the thermal insulation at the roof and the front.
|
Here we would like to show you now some examples of our reorganizations.
|
|

Mansion in Berlin - Zehlendorf
Roofing nature slate facade repair with Lotuseffect
|
 |

Façade in nature slates
German covering
Window sections in copper
|

Finnish message in Berlin - Zehlendorf roofing in nature slates
|
 |

Roof reorganization nature slate, window sills in nature slates
|

EFH before reorganization 2004
|
 |

Single family home after reorganization with heightening
|

Complete reorganization of a factory 2001
|
 |

After completion with roof terrace as well as LOFT and office space
|
A large reorganization lines up
Complete reorganization new building of 1998.
One may hardly believe it...
|
 |

|

Before the reorganization with the thermal image camera on error tracing...
|
 |

The mould caught already
after 4 years ...
|

Transfer of the terrestrial heat collectors
in 2 levels in 1,80 m and 80 cm depth
|
 |

Full thermal insulation front with stage crease insulation WLG 0,35
120 mm thickly on old 36 cm the thick brick-work
|

Installation of the Photovoltaic- system 8.19 Kwp Monocrystalline 210wp/Modul! Achievement and yield become over modem in the Internet represented
|
 |

Installation of 2 pieces of terrestrial heat plants17KW direct evaporation with terrestrial collectors, 7 KW of brine- pump with depth drilling 2 x 60 m
|

After the complete reorganization of the
dwellings...
|
 |

After the reorganization 2006
External opinion
|

Computer-controlled irrigation plant with own well for water supply
|
 |

Organization of the exterior installations
|
Energy passport before reorganization
Building cover on: 72,80 Kwh/(m²a)
Plants expenditure number: 1,45
CO2 emissions: 27.70 kg of CO2/(m²a)
Primary egergy need:123,40 Kwh/(m²a)
Final power requirement
Natural gas: 5,978 m³/year = 106 Kwh/(m²year)
current- mix: 1,008 Kwh/year
= 2 Kwh/(m²year)
Energy efficiency class C
Costs of gas, current …:
approx. 8,500.00 €/year
Heated floor space: 504 m² = 5425,18 squarefeet
|
 |
Energy passport after reorganization
Building cover on: 58,30 Kwh/(m²a)
Plants expenditure number: 0,93
CO2 emissions: 15.00 kg of CO2/(m²a)
Primary energy need: 65,90 Kwh/(m²a)
Final power requirement
Natural gas: 0 m³
current-mix:11.077 KW/H/year
= 22 Kwh/(m²year)
Energy efficiency class A
Costs of current:
approx. 3,250.00 €/year
Heated floor space: 504 m² = 5425,18 squarefeet
|
The KFW bank promotes CO2 saving reorganizations, it is worthwhile oneself…
Consultation - planning - computation - reorganization - letting - administration